Knittrix · Construction operations

The trusted-answer layer for construction documents.

Knittrix sits on top of the toolchain you already run. Ask plain-English questions about your specs, contracts, RFIs, and drawings — get answers fast, with the source page behind every word.

Request accessOpens a third-party scheduling dialogPilot cohort · By application

01 · The afternoon scramble

The 800-page spec doesn't have to be a 30-minute hunt.

Scenario

A change order lands at 4:45 PM. The PM has fifteen minutes to find which spec section governs the curtain-wall warranty before the GC owner's call. They scroll. They search. They give up and ask the architect.

Scenario

A submittal review at 11 PM — three drawing sheets, two product cut sheets, an addendum no one filed. Half the time spent on the answer is time spent finding where the answer lives.

02 · What an answer looks like

A Knittrix answer, with a citation

QuestionGrove Place · A201

What's the liquidated damages clause on the Grove Place contract?

Knittrix

A201 § 9.10 sets liquidated damages at $2,500 per calendar day past substantial completion, capped at 10% of the contract sum.

A201 § 9.10Liquidated Damagesp. 27Every claim is anchored to a page. Click a citation in the app — the document opens at the line.

03 · What’s different

Three things generic AI PDF tools don’t do.

  1. Construction-native parsing

    Knittrix knows CSI MasterFormat, AIA article numbering, and drawing-sheet metadata. Citations read “A201 § 9.3.1”, not “document_chunk_447”.

  2. Citations are first-class

    Every claim is anchored to the page it came from. Click the citation, see the source. If the answer isn’t in your documents, Knittrix says so.

  3. Augments people

    Knittrix gives you what your documents say. Decisions stay yours; sources stay traceable; nothing happens behind your back.

04 · How it reads a spec book

How Knittrix reads CSI sections

Division

09Finishes

  1. 09 21 16Gypsum Board Assemblies14 pp
  2. 09 30 00Tiling22 pp
    1. Part 1General
    2. Part 2Products
    3. Part 3Execution
  3. 09 65 00Resilient Flooring9 pp

05 · A note from the founder

Why we built Knittrix

I started Knittrix after watching project managers lose afternoons to PDF scrolling. Generic AI tools couldn’t help — they hallucinated article numbers, lost citations, and missed how construction documents are actually organized.

Knittrix is built construction-first. CSI codes, AIA articles, and drawing-sheet metadata aren’t bolt-ons — they’re the structure the retrieval respects. Every answer carries a citation a PM can verify in seconds.

We’re taking the next pilot cohort by hand. If your team spends real time hunting through specs, contracts, or RFIs, I want to talk.

06 · The trust posture

How Knittrix earns trust

We don’t disappear into a black box.

Every claim Knittrix makes cites the page it came from. Today, that’s questions about your specs, contracts, RFIs, and drawings.

As the product grows into agents that help draft RFIs, prep payment apps, and route submittals — that rule won’t bend. Every action stays yours to approve, every conclusion stays traceable to its source.

07 · Join the pilot cohort

We onboard pilots by hand.

Small groups, real attention. Tell us about your work — we’ll reply personally within two business days.

Apply to the waitlist

We don’t sell or share emails. Replies come from dow@knittrix.com.

Or talk first

A twenty-minute call to walk through Knittrix on real construction documents. No deck.

Opens a third-party scheduling dialog

Prefer email? Write dow@knittrix.com.